News Center
Company News
Industry News

  Company News You Are Here: Home - Company News
The First Gas Dehydration Project Has Been Completed and Delivered [2015-12-3]

Since November, 2015, the Bangladesh Gas Dehydration Skids have come to as built stage. This project was designed by Sinopec Petroleum Engineering Design Institute (SPE) and contracted from ZICOM (from Singapore). After severe acceptance tests, the goods have been delivered in batches. So far, this project has been our first use in overseas as dehydration system and makes lots of differences in expanding production series and overseas marketing.






Previous: Celebration Of Veritas-MSI’s 12th Birthday[2014-8] Next: Merry Christmas! [2015-12-25]



[Close]


Tel: 0086-574-8699 5600  Fax: 0086-574-8686 7893 Copyright(c) 2014 Veritas-Msi All rights reserved